Determinant Constraining Factors to Effective Management and Delivery of Public Sector Projects in Rivers State Nigeria
Abstract
This study investigates the determinant constraints affecting the effective management and delivery of public sector projects in Rivers State, Nigeria. Despite considerable investments in infrastructure and willingness of Government to drive development through such investment, public projects in the region are often plagued by inefficiencies, cost overruns, delays, and abandonment. Using a survey design and Principal Component Analysis (PCA), the study identified six major constraining factors: insufficient fund release, bureaucracy and weak institutional capacity, political interference, corruption and embezzlement, poor project conception and planning, and managerial inefficiency. These factors collectively account for approximately 70% of the variance in project performance outcomes. The study highlights the need for urgent reforms in public finance management, bureaucratic processes, institutional capacity building, and project governance. It recommended the enhancement of funding mechanisms, depoliticizing project execution, enforcing accountability, and building technical capacities among public project managers. The findings contribute valuable insights for policymakers and practitioners aiming to optimize public infrastructure and service delivery in Nigeria’s public sector.
References
Nigerian Public Sector: A theoretical appraisal journal of African
public sector development, 5(1), 22-36.
Adeyinka, F. M., &Adewuni, A. P. (2023). Enhancing public service delivery in
Nigeria through agile practice.Journal AdministrasiPublik, 13(2), 192-206.
Afolabi, B., &Nwankwo, C. (2021). Structural and behavioral challenges in
Nigeria public sector management.West African Journal of Public
Administration, 9(2), 33-48.
Akintola, L., Aderinlewo, O., &Akande, S. (2023).Constraints of Project
Management in the Construction Industry.Journal of Engineering Studies
and Research, 29(4), 7-16.
Akpan, E. O. P and Chizea, E. F. (2010); Project Management: Theory and
Practice.Owerri. FUTO Press Ltd, FUTO.
Alaloul, W. S., Liew, M. S., Zawawi, N. A. W. A., & Kennedy, I. B. (2021). Leadership
and its role in boosting the performance of construction projects. Internal Journal of
Construction Management, 21(10), 1067-1076.
Alragabah, Y. A., & Ahmed, M. (2024). Impact assessment of critical success factors
(CSFs) in public construction projects of Saudi Arabia. Frontiers in
Engineering and Built Environment, 4(3), 184- 195.
Barezeele (2000); Inequality and Poverty in Developing Nations.Stata Press. U.S.A.
Benjamin, A. (1991); Poor infrastructure and its Effects.Amacom Press. U.S.A.
Boutinet, E. F. (1990); An Appraisal of Public Project Performances. Nostrand Reinhold N. York.
Cooller E. and Davies R. (2002). Construction Project Management: Planning Scheduling and Controlling; New Delhi. Tata McGraw Hill Education Private Ltd.
Echeme, I.I, &Moneke, U. U. (2016).Analysis of Time and Cost.Performance of Construction Projects in Rivers State, Nigeria.PM World Journal, 5(8).
Kassel David S. (2010); Management of Public Sector Projects. A Strategic Framework for success in Era of Downsized Government. CRC Press Taylor and Francis.
Kingombe C. K. M. (2011); Mapping the New Infrastructure.Financing Landscape (http:www/odi.org.uk London Oversea Development Institute.)
Myles G.D. (1995); Public Economics; Cambridge University Press.
Meleod Z., Doolin B., MacDonel M. (2012) M. (2020). Significance of Scope in Project Success.Procedia Engineering, 123, 496-563.
Nagarajan K. (2012); Project Management, Project Appraisers Project Managers, Entrepreneurs, Academic and case Studies.6th ed. Delhi.New Age Int’l (p) Ltd.
Nwinyokpugi, P. N., &Bestman, N., (2020). The E-Governance Application; improving the administrative efficiency of public sector in Rivers State, Nigeria.GPH- international journal of computer science and Engineering volume 3, issue 2.
Obebe, O., et al. (2024).Flawed institutional structures: Project Managers Underutilized in Nigeria’s Construction Industry.Building, 14(3), 807.
Obinna, C. O., (2020). Application of management theories in public sector project execution in Nigeria.International journal of management science, 8(1), 110-122.
Ojiako, U., et al. (2023). Variations in critical success factor of ppp-procured construction projects over lifecycle phase. Production Planning and Control.
Okon, E. E., &Chukwu, M. C. (2022).Analysis of constraining factors in public sector project management in Rivers State.Nigeria Journal of Public Administration and Management, 34 (2), 45-61.
Oyedele, O. A. (2012); The challenges of Infrastructural Development in
Democratic Governance.ISOIC-Construction Economics and Management.
Randol D.A. (2024); “Why Development Projects Fail: Constraining factors of Project Management in Developing Countries. Project Management Quarterly.Vol. 9.
Robbins, S. P., & Judge, T. A. (2017). Organization Behaviour (17thed.). Pearson.
Starchsh Group (1995); The Standish Group Report: Claos.
Streamsowers& Kohn. (2024,May 3). A Commentary on the Nigerian Public Sector Governance Draft Code 2024.Mondaq.
Taye, O. O., & Dada, M. O. (2012).Appraisal of private sector innovation in infrastructure development in Lagos State, Nigeria.Mediterranean Journal of Social Sciences, 3(2), 2039-2117.
Tuoyo, L. E. O. (2024).The Future of Public Administration, Challenges and Prospects in Nigeria: A Study of Rivers State Ministry of Housing and Urban Development. (2015-2023). Rapid Journals, volume 1, issue 9.
Weber, M. (1947).The theory of social and economic organization (A. M. Henderson &T. Parson, Trans.).Oxford University Press.
Wirrick David W. (2009); Public Sector Project Management: Meeting the
Challenges and Achieving Results. New Jersey. John Wiley and Sons.
World Bank. (2020); World Development Report 2020: Trading for
Development in the Age of Global Value Chains. Washington, DC:
World Bank.https://doi.org/10.1596/978-1-4648-1457-0
Copyright (c) 2025 IJO -International Journal of Business Management ( E:ISSN 2811-2504 ) (P.ISSN: 2384-5961)

This work is licensed under a Creative Commons Attribution-NonCommercial-NoDerivatives 4.0 International License.
Author(s) and co-author(s) jointly and severally represent and warrant that the Article is original with the author(s) and does not infringe any copyright or violate any other right of any third parties and that the Article has not been published elsewhere. Author(s) agree to the terms that the IJO Journal will have the full right to remove the published article on any misconduct found in the published article.